Client: Islamic Republic of Afghanistan Ministry of Public Works

Specifically, the project includes Site-Adapt construction of the Road including Dinning Facility and LSA for the Title II of the project and Man Camp for over a 650 employees (500 laborer, 65 Staff and 85 Escorts), site construction, site utilities, site grading and drainage, force protection

, and use of dynamic security to ensure safe working environment for our staff and the Title II working on behalf of the Italian Government. The construction efforts of the road includes multiple disciplines and multiple structures such as Mobilization, Survey and As-Built Design, Earthworks (1.2 Million Cubic Meters of Clearing and Grubbing, Cut and Fill, Embankment, Grading and Compaction), 82 Km of Road Work (Subbase 3cm, Base Course 20cm, Bituminous Prime Coat 5cm, and Asphalt Wearing Course 6cm Thick) and Structures (125 Culverts varying from 80cm to 3 meters wide) Vertical Structures (22 Concrete Bridges 36m x 6m each, 5 km of Stone Masonry and Reinforced Concrete Retaining Walls, Gabion Walls, and Side Drains). At this time, our team has logged over 1,816,600 man-hours without a lost time incident and has utalized 120 pieces of heavy machinaries on this project.