The Qadis Khordak water storage dam project is a technical feasibility study and design project. The ministry of rural rehabilitation and development (MRRD) is seeking a consultant partner who will provide the overall technical study, social and economic study, survey and design of the project.

The project consists of the completion of design and construction of new facilities and renovation of

existing facilities for the National Military Hospital Medical Branch School in Kabul District, Kabul

Province, Afghanistan. The project include but not be limited to the design verification, material, labor, and equipment to complete the construction of buildings and utilities for a new female barracks and a renovated male barracks

new permanent facilities at lsa - camp egger

The Kabul LSA projects (i.e., New Camp Sullivan) consist of the complete reconstruction of the existing Camp Eggers site in Kabul, Afghanistan. The site is situated near the city center of Kabul in Afghanistan and is about 6.1 hectares (15 acres) in size. The site is specifically located to the south of the Embassy of Germany, to the east of the Embassy of Indonesia, to the north of Sulh Road, and to the west of Amani High School.

Omran Holding Group-Green Tech Construction & Engineering Co. was awarded the contract to implement the environmental studies of 5(five) Designated oil fields and 3 (three) Designated blocks. Total 8 (eight) BEA (Baseline Environmental Assessment) and 8 (eight) EIA (Environmental Impact Assessment) under a contract with CNPCI Watan Oil and Gas Afghanistan Ltd.The entire blocks encompass 4549 square kilometers in three blocks.

More

Design and Construction of a new Tajikistan Commercial Customs Facility (CCF) in support of the newly completed Afghanistan-Tajikistan Bridge. Project site is located in Nizhny Pyandzh, Tajikistan, on the Tajik side of the new Afghanistan-Tajikistan Bridge, and in an area adjacent to the (Tajik) Border Crossing Point (BCP) currently under construction. The project is defined as the design, construction, material, labor, furnishings, and equipment necessary to construct buildings, parking, roads etc.

national army regional military training center

The project consists of the construction for completion of the Afghanistan National Army Regional Military Training Center (RMTC) adjacent to the Corps Support Battalion (CSB) at Camp Hero, Kandahar Province, Afghanistan. The RMTC is an ANA Military Training Establishment which will house approximately 3,000 personnel consisting of trainees and staff.


 

The project was including of the following items:

The project consists of design and construction of a single-story hospital addition that has been partially constructed to an existing hospital at an ANA Regional Garrison Kandahar, Afghanistan. Additional patient care facility, along with related administrative, visiting and support capabilities enhances the ability to treat all patients within the garrison.

The project consists of the design, site adaptation and construction of; new permanent facilities in an expanded area of New Camp Scorpion; new permanent Training Obstacle Course, Fast Roper Insertion and Extraction System (FRIES) Tower within the existing perimeter of New Camp Scorpion;

More

Design and Construction of an expansion to the existing Regional Military Hospital on Camp Thunder garrison in Gardez, for the Afghan National Army (ANA); design program, site development & improvements, design/build facilities, concrete structural repairs and plumbing.

This project consists of the design, materials, labor, equipment and construction of various buildings and infrastructure upgrades for the Armored Branch School at Pol-e-Charki Afghan National Army (ANA) Garrison located at Kabul Province, Afghanistan.

]This WWTP was designed to handle waste water flow for 4000 persons, with considering the 744m3/average daily flow. The effluent quality should achieve to 30 mg/l BOD and TSS. This Treatment plant consist: lift station, headwork, aeration lagoon, settling lagoon, sludge pump, chlorination tank and sludge drying bed.

salang corridor repair and maintenance

The objective of this project is to maintain a trafficable condition at the current or an improved Level of Service for 83 km of the Salang Highway from Jabal Seraj to Khenjaan.  A trafficable condition is defined as a road that is passable at all times and Level of Service being defined by the number of deficiencies per kilometer of highway.

We provided two (2) AEROMIX model A-70M36-SUSHC prefabricated steel extended aeration/complete mix active sludge wastewater treatment systems as manufactured by AEROMIX Systems, Inc., Golden Valley, Minnesota. Each wastewater treatment system has a design flow of up to 70,000 gallons per day of domestic wastewater and includes a flow equalization tank, aeration tank, clarifier, sludge holding tank, and all necessary vessels, internal piping, weirs, and baffles.

The project consists of the Site Adapt and Modified Site Adapt (Design Build) construction of a new Forward Area Arming and Refuel Point (FAARP) for the Afghan Air Force (AAF) in Gardez District,

Paktiya Province, Afghanistan. The site is located on the most southwestly side of the Gardez ANA garrison.

More

The project consists of the specified site grading, design for facilities, site and infrastructure, and installing two new wastewater treatment packages for ANA Darulaman Garrison in Kabul Province, Afghanistan.There are two (2) Solution Idea Model HydroXLNT SPEA-302-FESHT consisting of two treatment units (Trains A & B) for the purpose of treating the domestic wastewater. Capacity for each package is 100000 gpd. Each new treatment unit has a flow equalization tank, aeration tanks, clarifiers, sludge holding tank and Chlorination tank. The packages are designed for above ground installation on a concrete slab

This Project consists of the site-adapt and construction of site development and facilities to support the Afghanistan National Police (ANP) program for one (1) Border Police Airport Security Unit and Entry Control Point at the Kandahar International Airport, Kandahar Province, Afghanistan. Project scope includes management, planning, incidental design, material, labor, and equipment necessary

More

Construction, Improvement, and Reconstruction of a new pavement and integral sub drainage system within the Salang tunnel; electrical power plant to provide power for lighting and ventilation refurbishment, power generation fuel storage, a camera monitoring system, and necessary site work for the Ministry of Public Works (MOPW) in the Salang Pass, Parwan Province, Afghanistan.

The Project Photo

The work in this contract is to complete the design and construction of a partially completed 2-Story Afghanistan National Police (ANP) Uniformed Police District Headquarters. This project is defined as the management, planning, design, material, labor, and equipment to site adapt and complete construction of all utilities, vehicular access, buildings, force protection measures, site security, mine clearance activities, and other features. The project is located in Injil District, Herat Province.

The four SRK mineral licence blocks (Gold Mines) are located in the Ragh District of the Badakhshan Province. In this project, the exploration or resource development plan is intended to produce an estimate of potential resources contained within the prospect. It is also aimed to Identify other prospective areas outside of the Ragh Zone, to inform subsequent phases of the exploration campaign. Green Tech, a key subsidiary of OHG, is assigned for providing a detailed Social and Environmental impacts of the Phase 1 exploration.

The project consists of the design and construction of a new MOI Supply Point Compound for the Afghan National Police (ANP) in Ghazni District, Ghazni Province, Afghanistan.

Green Tech, a key subsidiary of OHG, is currently undertaking the environmental assessment studies of one of the biggest oil refinery facilities in Afghanistan. Dorjeoil refinery is located in Mazar-e-Sharif and it is planned to providing substantial amount of refined oil every day. As the petroleum products might have significant impacts on the environment therefore Green Tech was assigned for providing mitigation, remediation and proper management plans to minimise the adverse impacts of the activities during the operation.

The project consists of the design and construction of a Camp Shaheen Group B, infill and expansion for the 209th Corps, Afghan National Army use in Balkh Province in Afghanistan. Site is located within the existing Camp Shaheen. Completion of the life support areas and supporting infrastructure is a critical requirement. The project is defined as the design, material, labor, and equipment to execute survey, geotechnical and design, site grading and site preparation, foundations and buildings, water supply and sanitary system, electrical, mechanical and HVAC systems for a design population of 1696 troops.

This project consists of design and construction of a new DFAC, three additional Guard Towers, and modifications to existing buildings, replacement and additions to Concrete Perimeter Walls with ECP control facilities. All existing utility facility infrastructure will be replaced or upgraded, including MV electrical source, sewer collection system, water well and elevated storage with distribution system. Extensive demolition of existing facilities, are to be coordinated with new construction.

The Aybak Water Supply and Distribution System included design and construction the entire Aybak City water supply which include laying 47 km main pipe trunks and water distribution to the households, water treatment and water disinfection system, water tanks, booster pump house and pump stations, supply and installation of valves, construction of manholes, chambers, and other related appurtenances.

Design and Cnstruction services for the expansion and upgrade of utility systems at ANA Garrison in Kunduz Province, Afghanistan to support basing additional organizational elements of the 209th Corps. The work does include all the civil (including geotechnical), mechanical, electrical and structural design elements required for the construction of the utility upgrades.

Design and Construction of a Camp Shaheen Group C, Expansion for the 209th Corps, Afghan National Army use in Balkh Province in Afghanistan. Site is located adjacent to and within the existing Camp Shaheen. The project is defined as the design, material, labor, and equipment to construct buildings, parking, Utilities and other infrastructure for Afghan National Army (ANA).

Client: Islamic Republic of Afghanistan Ministry of Public Works

Specifically, the project includes Site-Adapt construction of the Road including Dinning Facility and LSA for the Title II of the project and Man Camp for over a 650 employees (500 laborer, 65 Staff and 85 Escorts), site construction, site utilities, site grading and drainage, force protection

More

This project consists of the design and construction of site improvements and construction of facilities to support the Afghanistan National Border Police (ANBP) Units in Afghanistan. This project is defined as the management, design, material, labor, and equipment to design and construct and/or refurbish all utilities, roads, buildings, force protection measures

More

The project consists of design and construction of one range complex with 8 new ranges, and related roads and support facilities for the Afghanistan National Army at Camp Shaheen Afghanistan. The project is defined as design, material, labor, and equipment to construct the buildings, parking, utilities, observation towers, water well with pumping station and non-potable water system with non-potable water storage tank, weapon breakdown and ammo distribution building, utility storage building etc.

Design and construct a new medium voltage feeder and duct bank from the Matbea switch to the Wazir-akbar-kahn switch, tie to the JL15 medium voltage feeder, install 3 pad mounted sectionalizer switches, voltage conditioner, and transient voltage surge suppressors for NMH.

Design and Construction of a new wastewater treatment plant for Camp Shaheen in Mazar E Sharif in Afghanistan. The project is defined as the design, material, labor, and equipment to construct buildings, facilities, utilities and other infrastructure for the new plant; modify sewer collection system to re-route wastewater flow from the existing plant to the new plant; and restore existing plant site.

This solicitation is for a firm fixed price type contract consisting of the design, renovation, readaption and construction of an upgraded garrison's facilities for the Afghanistan National Army's use at Pol-e-Charkhi Garrison in Afghanistan to include: Pol-e-Charkhi Garrison Headquarters; Consolidated Fielding Center (CFC); Capital Division Headquarters; Security Compound; Military Intelligence Kandak; and Division Logistics Battalion.

Design and Construction for the completion of the Afghan National Army Troop Medical Clinic in Herat, Herat Province, Afghanistan. The project includes the design and construction for a Medical clinic which include a waiting area, lab, two procedure/exam rooms, an administrative office, and a bathroom.

Design and Construction of a small arms range complex with 3 different ranges which comprise of roads and support facilities for the Afghanistan National Army, Mazar-e-Sharif, Afghanistan. This project is defined as design, material, labor, and equipment to construct the facilities.

Design and Construction of new facilities for the Fuel Depot at Capital (Khuja Rwash) in Kabul, Afghanistan. Site is located both within and along the access road leading to the existing Fuel Depot compound. The project is defined as the design, material, labor, and equipment to construct buildings, parking, utilities and other infrastructure for a classroom building, paving of existing roads and adding a perimeter fence with Sniper S creen adjacent to the existing perimeter wall.

Design and Construction of ANBP to include all buildings, perimeter walls, gates, guard towers, parking, check point, and ECPs, fencing infrastructure improvements, roadwork and utilities, power, water, and sewage.

Design and Construction of two steel water storage tanks and a new storm drainage system for the KMTC (Kabul Military Training Compound) in Kabul, Afghanistan. The project is defined as the design, material, labor, and equipment to construct infrastructure for The KMTC including UXO removal and clearance, demolition and grading, road network, sidewalk and parking, water, water distribution system, electrical distribution system, exterior night lighting etc.

Design, Architectural, Engineering and Construction of a Steel Bolted 150,000 Gallon (568,000 Liter) Elevated Water Potable Tank and Well House in Kabul, Afghanistan. The construction of the project includes all labor, materials, equipment, services, water well, elevated steel bolted tank, water, electricity, geotechnical etc.

Design, Renovation, re-adaption and Construction of an upgraded garrison

Design and Construction of one range complex with 8 new ranges, and related roads and support facilities for the Afghanistan National Army at Camp Gamberi Afghanistan. The project is defined as design, material, labor, and equipment to construct the building, parking observation towers, weapon breakdown and ammo distribution building, security detail office building, covered bleachers, guard shack, fencing to control and protect range support facilities, earthwork to build erosion control structures, etc.

The project consists of the design and reconstruction of the existing sanitary sewer system at the Kabul Police Academy (KPA). The work includes a new centralized wastewater system including new gravity sanitary sewer mains, lift stations, force mains, manholes, waste water treatment plant sludge drying beds and an effluent disposal system.

Design and Construction of a new Hospital Addition at the ANA Garrison at Herat, Afghanistan. The addition is one facility that consists of Hospital patient sleeping room facility for 46 bed patients, administrative area for medical staff offices, Full service dining facility (DFAC) with kitchen and dining area with seating for 60 dining patrons.

Creation & Painting of (3) Bulk Fuel Tanks, fuel distribution pipe work & painting, ancillaries and installation of associated equipment at Camp Leatherneck, Afghanistan. The specification of the project consists of construction, mobilization/demobilization, additional design/shop fabrication, fuel tanks, grading, civil miscellaneous civil, control, center/ admin office, generator tank, foundation sections, floating pan, electrical etc.

Design and Construct of one Troop Medical Clinic (TMC) facility at the Afghan National Army Brigade, Camp Shaheen in Mazar-e-Sharif, Balk Province, Afghanistan. The project defines as design, material, labor, and equipment to construct the TMC, parking spaces, and connection to supporting utilities or construction of new ones to support the facility.

Design and Construction of Bulk Fuel Facility, Utilities, and Miscellaneous work for the New Mission Facilities in Herat, Afghanistan. The specification of the project includes installing two 20,000 USG double walled tanks with 3

The project consists of the design and construction of new Gravity Sanitary Sewers, Force Mains, Pumping Stations, Wastewater Treatment Plants and Control Building, Head works/Pre-Aeration Facility, Septage Dump Pad and Lift station, Sludge Drying Beds, Filter Press Building and related support facilities on Jalalabad Airfield, Jalalabad, Afghanistan

Design and Construction of one range complex with 8 new ranges, and related roads and

support facilities for the Afghanistan National Army at Camp Zafar Afghanistan. The project is defined as design, material, labor, and equipment to construct the following buildings, parking, utilities, and other infrastructure observation towers, covered mess areas, water well with pumping station and non-potable water system with non-potable water storage tank, latrine facilities with sewer collection system etc.

Design and Construction of eight (8) Afghan National Police (ANP) Uniformed Police District Headquarters facilities in the Herat province (Chsht-i-Sharif, Farsi, Ghoryan, Karukh, Obeh, Pashtoon Zarghoon, Shahre-i-Torghondi, Zendajan) of Afghanistan.

Design and Construction of Buildings 8 ,7 ,3 ,2# (DFAC, BARRACK, PUBLIC, Latrine, Welcome Center in Afghan Side of Sher Khan Border, Afghanistan.

Wastewater Treatment Plant and supply of 14 electrical tools for wastewater project of President Palace in Kabul, Afghanistan.

Design and Construction of five (5) Arms Storage Buildings, a (1) Fitness Center, and a (1) Fire Station addition, a wastewater treatment plant, (9) barracks, a steel water storage tank, for Afghan National Army use at Pol-e-Charki Garrison, Afghanistan. Afghanistan. Both located inside the existing garrison compounds. The project is defined as the design, material, labor, and equipment to construct buildings, parking, utilities and other infrastructure for Afghan National Army use.

Topography and mapping, development of the master plant; design and installation of Water Supply, Sewerage System, Storages and Electrical Systems in Omid-e-Sabz Township, Kabul, Afghanistan. Description: construction of sewage tanks, pits and sewage system designing, piping, piping of sewage, manhole construction, septic tanks and grease trap, survey, cleaning, excavation, masonry etc.

Omran was awarded the design and construction of ANA Training Range Complex at the Afghan National Army Brigade, Camp Shaheen in Mazar-e-Sharif, Balk Province, Afghanistan by the US Army Corps of Engineers.The project consists of design and construction of one range complex with 8 new ranges, and related roads and support facilities for the Afghanistan National Army at Camp Shaheen Afghanistan.